M'BOUNDI FIELD DEVELOPMENT

1015AAH_ABB_ (1)
1015AAH_ABB_ (2)
1015AAH_ABB_ (1)
1015AAH_ABB_ (2)

Project details

  • CLIENT: ABB / ENI CONGO
  • PROJECT: M'BOUNDI FIELD DEVELOPMENT - CONGO
  • PLANT: GAS DEHYDRATION UNIT AND GLYCOL REGENERATION PACKAGE
  • FLOW: 3000000 Sm3/DAY
  • TEMPERATURE: 57.6 barg
  • TEMPERATURE: 55 °C
  • LINE DIAMENTER : 12"

INCLUDING THE FOLLOWING UNITS ASSENBLED ON SKID:

– FEED GAS INLET COOLER
– GLYCOL CONTRACTOR
– EXCHANGER GAS / TEG
– FLASH DRUM
– CARTRIGE FILTERS
– CHARCOAL FILTER
– TEG CIRCULATIONS PUMPS
– ANTIFOAM STORAGE TANK AND INJECTION