SEC/PP9 BLOCK C&D, RIYADH

Riyad_bemco (2)
SAMSUNG DIGITAL CAMERA
Digital Camera
Riyad_bemco (6)
Riyad_bemco (4)
Riyad_bemco (3)
Riyad_bemco (2)
SAMSUNG DIGITAL CAMERA
Digital Camera
Riyad_bemco (6)
Riyad_bemco (4)
Riyad_bemco (3)

Project details

  • CLIENT: ARABIAN BEMCO C.o.
  • PROJECT: SEC/PP9 BLOCK C&D, RIYADH
  • PLANT: FUEL GAS SYSTEM
  • FLOW: 285075 kg/h
  • PRESSURE: 38 to 45 barg
  • TEMPERATURE: 10 to 60 °C
  • LINE DIAMENTER : 30"

INCLUDING THE FOLLOWING UNITS ASSEMBLED ON SKID :

– EMERGENCY SHUT DOWN VALVE
– METERING STATION
– CYCLONE COALESCER FILTER
– WATER BATH HEATERS
– PRESSURE REDUCING STATION
– FINAL COALESCER FILTER
– CONDENSATE TANK
– FLARE SYSTEM
– INSTRUMENT GAS SYSTEM
– CONTROL PANEL

Leave a Reply

Your email address will not be published. Required fields are marked *