BERROUAGHIA MW POWER PLANT

05_009_am_berroughia (6)
05_009_am_berroughia (5)
05_009_am_berroughia (4)
05_009_am_berroughia (3)
05_009_am_berroughia (2)
05_009_am_berroughia (1)
05_009_am_berroughia (11)
05_009_am_berroughia (10)
05_009_am_berroughia (9)
05_009_am_berroughia (8)
05_009_am_berroughia (7)
05_009_am_berroughia (6)
05_009_am_berroughia (5)
05_009_am_berroughia (4)
05_009_am_berroughia (3)
05_009_am_berroughia (2)
05_009_am_berroughia (1)
05_009_am_berroughia (11)
05_009_am_berroughia (10)
05_009_am_berroughia (9)
05_009_am_berroughia (8)
05_009_am_berroughia (7)

Project details

  • CLIENT: SIEMENS / SAIPEM
  • PROJECT: BERROUAGHIA 2x271 MW POWER PLANT
  • PLANT: FUEL GAS SYSTEM
  • FLOW: 158900 Nm3/h
  • TEMPERATURE: 5 to 45 °C
  • LINE DIAMENTER: 12"

INCLUDING THE FOLLOWING UNITS ASSEMBLED ON SKID:

– ESD VALVE, INLET FILTER SEPARATOR AND CONDENSATE TANK
– GLOBAL FISCAL METERING
– FUEL GAS HEATERS
– PRESSURE REDUCING
– FINAL SEPARATOR / FILTER
– CONTROL SYSTEM
– FINAL TURBINE METERING