Project details

  • CLIENT: DAEWOO E&C
  • PROJECT: SUR INDEPENDENT POWER PROJECT - OMAN
  • FLOW: 450000 Nm3/h
  • PRESSURE: 43 barg
  • TEMPERATURE: 5 °C
  • LINE DIAMENTER: 20"

INCLUDING THE FOLLOWING UNITS ASSEMBLED ON SKID :

– EMERGENCY SHUT DOWN VALVE
– K.O. DRUM UNIT
– INLET FILTERS SEPARATOR
– PRESSURE REGULATION JOULE THOMSON HEATER
– PRESSURE REGULATION STATION
– FUEL CONDENSATE TANK
– HOT WATER BOILER SYSTEM SKID
– GT FINAL CHANGE FILTERS SKID
– CONDENSATE TANK FOR GT FINAL CHANGE FILTERS
– COLD VENT STACK
– PILOT GAS FILTERS SKID