Project details
- CLIENT: ARABIAN BEMCO C.o.
- PROJECT: SEC/PP9 BLOCK C&D, RIYADH
- PLANT: FUEL GAS SYSTEM
- FLOW: 285075 kg/h
- PRESSURE: 38 to 45 barg
- TEMPERATURE: 10 to 60 °C
- LINE DIAMENTER : 30"
INCLUDING THE FOLLOWING UNITS ASSEMBLED ON SKID :
– EMERGENCY SHUT DOWN VALVE
– METERING STATION
– CYCLONE COALESCER FILTER
– WATER BATH HEATERS
– PRESSURE REDUCING STATION
– FINAL COALESCER FILTER
– CONDENSATE TANK
– FLARE SYSTEM
– INSTRUMENT GAS SYSTEM
– CONTROL PANEL